Washington Middle School Rain Water Harvesting

Washington Middle School installed a rainwater catchment system. There is a large fiberglass cistern in the ground used to collect rain water from the roof. This system uses the water from the cistern to flush toilets throughout the school. Although no permits were obtained for the school to install the system, the catchment system was installed as part of the Washington State Senate Bill 5509.

Permeable ICF wall system at GRuB Education Center

Garden Raised Bounty is a non-profit environmental learning center built upon the generosity of a whole community. The first-floor walls were constructed with Faswall ICF’s (insulated concrete forms), creating an efficient open-diffusion permeable wall system. Non prescriptive parts to this project include custom engineering for an ICF, energy code compliance an non prescriptive wall assembly.

Photovoltaic Roof Mounted Array at Washington Middle School

Washington Middle School installed a 1.1 KW solar photovoltaic array on the roof of the library. The permit for the panels took over four months to be approved. The panels were installed as part of the Washington State Senate Bill 5509. The panels offset energy costs throughout the school.